[advertisement]

September 1, 2008


Jack McGuinn




Design Bearings Features

NASA Gets Down and Dirty for SARJ Solution

For more than 10 months, NASA ground engineers and International Space Station (ISS) astronauts have been struggling with a perplexing malfunction of one of the station’s two solar array rotary joints (SARJ).
Share and save:



This article appeared in the September/October 2008 issue.


Read PDF

[advertisement]